Case Studies

Case Studies

  •  Wrapping a huge scaffold tower
  •  Precision planning
  •  Remained insitue for 12 months
  •  No noise or local disruption
  •  The 9000 Square Meter Challenge
  •  The Mesh Banner at St.Pancras
  •  An Installation on Devon House
  •  Revitalising Derelict Spaces
  •  Wrapping WWI Warship
  •  While on the Thames
  •  Short 7 day period
  •  Whatever the weather
  •  Detailed vessel survey for a 3D model
  •  Completed before the deadline
  •  25m x 30m banner hung over the White Cliffs of Dover